EV charger installation in Fremont, California

Fremont is home. Our office is on Cushing Parkway, which means survey visits here are usually same week and often next day, and our crews are not burning an hour each way on the Dumbarton.

Get your Fremont quote

Fremont housing and electrical panels

Fremont's housing stock splits sharply. The Mission San Jose and Warm Springs developments built from the 1990s onward generally have 200-amp panels with spare capacity, and those installs are straightforward — often four hours, wall-mounted, done. Older Centerville, Niles and Irvington homes frequently run 100-amp service, and there a load-management device usually beats a full panel upgrade by several thousand dollars.

What we see locally

Fremont has an unusually high EV ownership rate, partly because of the Tesla factory on Fremont Boulevard and the broader manufacturing presence. Practically, that means we see a lot of two-EV households here, and two cars on one circuit is a genuine design question rather than a theoretical one. Load sharing between two units on a shared feeder solves it without a service upgrade in most cases.

Permits and inspection in Fremont

Electrical permits go through the City of Fremont Building & Safety Division. Straightforward residential EV charger permits are typically issued quickly over the counter or online, and inspection scheduling is generally not a bottleneck. We pull the permit and meet the inspector.

What we install in Fremont

All three of our units are available here, and the right one depends on how long the vehicles sit parked rather than on the property type:

  • AX-Home 40 — 9.6 kW Level 2 for houses and townhouses. Roughly 30 miles of range per hour, which fills any commuter EV overnight. $1,400–$3,200 installed.
  • AX-Fleet 80 — dual-port 19.2 kW for workplaces, apartment parking and light fleet depots, with load sharing and per-driver billing.
  • AX-Rapid 180 — 180 kW DC fast charging for retail and public sites, with CCS1 and NACS cables. Quoted per site; utility timelines dominate the schedule.

Areas of Fremont we cover

We work throughout Fremont, including Mission San Jose, Warm Springs, Niles, Irvington, Centerville, Ardenwood, Cherry-Guardino and Glenmoor.

Rebates: Fremont is in PG&E territory, so utility make-ready programmes may apply to commercial and multifamily projects. Note that the federal 30C tax credit expired on 30 June 2026 — see our current incentives page for what is genuinely still available.

Get a fixed price for your Fremont install

Send a photo of your panel and where you park. We will come back with a real number, and tell you honestly if there is a cheaper way to get what you need.