Permits and inspection in San Jose
Permits run through the San Jose Building Division. Residential EV charger
permits are commonly handled online, though plan check on commercial multi-port projects
takes longer and is worth starting early. We handle submission and inspection.
What we install in San Jose
All three of our units are available here, and the right one depends on how long the
vehicles sit parked rather than on the property type:
-
AX-Home 40 — 9.6 kW Level 2
for houses and townhouses. Roughly 30 miles of range per hour, which fills any
commuter EV overnight. $1,400–$3,200 installed.
-
AX-Fleet 80 — dual-port
19.2 kW for workplaces, apartment parking and light fleet depots, with load sharing
and per-driver billing.
-
AX-Rapid 180 — 180 kW DC
fast charging for retail and public sites, with CCS1 and NACS cables. Quoted per
site; utility timelines dominate the schedule.
Areas of San Jose we cover
We work throughout San Jose, including
Willow Glen, Almaden Valley, Berryessa, Evergreen, North San Jose, Cambrian Park, Rose Garden and Santa Teresa.
Rebates: San Jose is in PG&E territory, so utility
make-ready programmes may apply to commercial and multifamily projects. Note that
the federal 30C tax credit expired on 30 June 2026 — see our
current incentives page for what is genuinely still
available.